The Cost Breakdown Section includes the option to specify capital, O&M, and replacement costs by line item for Solar or Storage equipment. You can edit the cost information or add additional line items to each of the provided sections.
▪Direct Capital
▪Indirect Capital
▪Annual Operations and Maintenance Costs (OPEX)
▪Major Replacement Costs
Select Cost Breakdown to edit line item costs or to add additional line item costs.
To add an additional line item, select the add icon. Enter a description, value, and choose the corresponding units to ($, % direct, $/kW, $/kWh, $/unit) in the drop-down.