Helpful Links
The links on the left provide several options to assist with your HOMER Front project.
Free Resources
Sources for further information
Navigation: Glossary
DC Primary Load Served
Type:
Output Variable
Units:
kWh/yr
Symbol:
Eprim, DC
The DC primary load served is the total amount of energy that served the DC primary load(s) during the year.