Please enable JavaScript to view this site.

Front Web Manual

Topics

Navigation: Results

Optimization Results

Scroll Prev Top Next More Search

graphics_HOMERbltr200x60


After you click Next and the calculation is complete, HOMER will display the results in table format. If you have included a sensitivity, double-click to view all the feasible simulations that were run for the selected sensitivity case to open the Optimization Results table.

 

The highest net present value simulation for that specific sensitivity is displayed in the table and includes the following metrics.

 

Configuration and sizing

Revenue

Cost

Project economics​

Configuration and sizing metrics

 

Configuration and Sizing

PV Solar (MW)

Energy Storage

Converter

Solar Converter

Storage Converter

total installed DC size

total installed MW/MWh size

total capacity in MW

size in MW or size relative to the solar total installed size, also known as PV to Converter Ratio

size in MW, relative to the energy storage capacity. This is analagous to the C-rate, which is the storage power/storage energy capacity. The units for C-rate are 1/hour

Revenue

 

The Optimization Results table includes a Revenue section that will display the revenue associated with the selected system. Depending on the Application or selected Energy markets, The revenue may include:

.one or more selected energy markets

the capacity and energy revenue from a capacity market,

and the revenue from a time of delivery power purchase agreement.​

Cost

 

The Optimization Results table includes a Cost section that displays the capital and operating expenses for the selected simulation.

Capital expenses in year 0​

Operating expenses, annualized ​

Project economics

 

Project Economics

NPV (Net Present Value)

IRR Internal rate of return (%)

Payback Time

The present value of all costs of installing and operating the system over the project lifetime in ($)

The discounting rate that makes the Net Present Value equal to zero (%)

The simple payback time in years that it takes to recuperate the capital expenses from year 0

 

See Also

Net Present Value

Sensitivity Results Table

HOMER Front by UL Version 1.0 Login: HOMER Front © by Underwriters Laboratories (UL)