HOMER Knowledge Base

HOMER Knowledge Base

Generator availability

Is there a way to model generator availability other than the forced on, forced off, optimized mechanism?

 HOMER assumes that the generator is available at all times except when it is scheduled off in the generator scheduling tab.  You can force the generator off for specific hours for weekends and weekday for each month.